Mechanical systems and siding progressing
For the last couple of months, the tradesmen have been installing the plumbing, electrical, HRV ducting, and network cables. On the exterior of the house, the shingles have gone on the roof and the Hardie board siding is being installed. I just took a series of photos of the basement with drains shown, before the basement slab is poured. You never know when you'll need the location of drains under the slab. Actually, hopefully never...
Posted by Guy | Posted on 2010-04-21 at 7:34 PM | Public Post